42-163-33024
Final Completion HorizontalSTEWART-MENEFEE UNIT III
FRIO County · District 1 · CALTEX ENERGY CO. · PEARSALL (AUSTIN CHALK)
Permits
1
Max Depth
7,100 ft
First Permit
1991-03-07
Latest Activity
1991-03-07
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1991-10-29
Shut-In
—
Plugged
2009-01-07
!
EWA / Permit operator mismatch
Scheduling: CALTEX ENERGY CO. ≠ Permit: HYDROEX, INC.
Resolved via: scheduling → CALTEX ENERGY CO.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#385411 A HYDROEX, INC.
received 1991-03-07
Well Details
- Well Number
- 1
- Max Depth
- 7,100 ft
- Drill Type
- Horizontal
- County
- FRIO
- District
- 1
- Operator
- CALTEX ENERGY CO.
- Completed
- 1991-10-29
Operator
- Name
- CALTEX ENERGY CO.
- Location
- LULING
- P-5 Status
- Y (filed 2011-01-07)
- Cum Oil (all leases)
- 156,182 bbl
- Cum Gas (all leases)
- — mcf