42-165-31636

Final Completion

JONES HEIRS C

GAINES County · District 8 · TRINITY EOR LLC · JONES RANCH SOUTH (SAN ANDRES)

RRC Lookup

Permits

1

Max Depth

5,200 ft

First Permit

1979-06-05

Latest Activity

1979-06-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2008-08-29

Shut-In

Plugged

2013-07-02

!

EWA / Permit operator mismatch

Scheduling: TRINITY EOR LLC ≠ Permit: KIDD, BARRON

Resolved via: schedulingTRINITY EOR LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2013-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#50040 A KIDD, BARRON
received 1979-06-05

Well Details

Well Number
C1
Max Depth
5,200 ft
Drill Type
Vertical
County
GAINES
District
8
Completed
2008-08-29

Operator

Location
MIDLAND
P-5 Status
Y (filed 2019-03-08)
Cum Oil (all leases)
5,339,201 bbl
Cum Gas (all leases)
— mcf
Total Permits
24

External Links

Live © 2026 Petrora