42-165-32914
Final CompletionTAYLOR C
GAINES County · District 8 · SMITH PIPE OF ABILENE · CARTER-NEW MEXICO (SAN ANDRES)
Permits
1
Max Depth
5,300 ft
First Permit
1984-07-05
Latest Activity
1984-07-05
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-09-04
Shut-In
—
Plugged
2003-11-25
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: L.C.S. PRODUCTION COMPANY (reported 1998-12)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WHEELER, W. RIDLEY, EST.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2004-01
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#244060 A WHEELER, W. RIDLEY, EST.
received 1984-07-02
Well Details
- Well Number
- 3C
- Max Depth
- 5,300 ft
- Drill Type
- Vertical
- County
- GAINES
- District
- 8
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1984-09-04
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf