42-165-32970

Final Completion

TAYLOR

GAINES County · District 8 · SMITH PIPE OF ABILENE · CARTER-NEW MEXICO (SAN ANDRES)

RRC Lookup

Permits

1

Max Depth

5,300 ft

First Permit

1984-09-18

Latest Activity

1984-09-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-10-31

Shut-In

Plugged

2003-12-17

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: L.C.S. PRODUCTION COMPANY (reported 1998-12)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WHEELER, W. RIDLEY, EST.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2004-01

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#252060 A WHEELER, W. RIDLEY, EST.
received 1984-09-17

Well Details

Well Number
2W
Max Depth
5,300 ft
Drill Type
Vertical
County
GAINES
District
8
Completed
1984-10-31

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora