42-165-33144
Final CompletionTAYLOR A
GAINES County · District 8 · SMITH PIPE OF ABILENE · CARTER-NEW MEXICO (SAN ANDRES)
Permits
1
Max Depth
5,300 ft
First Permit
1985-02-01
Latest Activity
1985-02-01
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-04-26
Shut-In
—
Plugged
2003-12-16
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WHEELER, W. RIDLEY, EST.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2008-03
Operator History
originally filed by WHEELER, W. RIDLEY, EST. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#265799 A WHEELER, W. RIDLEY, EST.
received 1985-01-31
Well Details
- Well Number
- 4A
- Max Depth
- 5,300 ft
- Drill Type
- Vertical
- County
- GAINES
- District
- 8
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-04-26
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf