42-165-35331

Final Completion

JOHNSTON JOHN M

GAINES County · District 8 · SABINAL ENERGY OPERATING LLC · HARRIS

RRC Lookup

Permits

1

Max Depth

6,300 ft

First Permit

1998-02-12

Latest Activity

1998-02-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2024-04-24

Shut-In

Plugged

2024-06-12

!

EWA / Permit operator mismatch

Scheduling: SABINAL ENERGY OPERATING LLC ≠ Permit: TEXACO E & P INC.

Resolved via: schedulingSABINAL ENERGY OPERATING LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1998-03

Last Production

2024-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#473304 A TEXACO E & P INC.
received 1998-02-12

Well Details

Well Number
1
Max Depth
6,300 ft
Drill Type
Vertical
County
GAINES
District
8
Completed
2024-04-24

Operator

Location
THE WOODLAN, DS
P-5 Status
Y (filed 2025-05-02)
Cum Oil (all leases)
36,722,630 bbl
Cum Gas (all leases)
23,917 mcf
Total Permits
146

External Links

Live © 2026 Petrora