42-165-36048

Final Completion

ELAM

GAINES County · District 8 · SABINAL ENERGY OPERATING LLC · ROBERTSON N. (SAN ANDRES)

RRC Lookup

Permits

1

Max Depth

9,000 ft

First Permit

2003-11-04

Latest Activity

2003-11-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2003-12-16

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: SABINAL ENERGY OPERATING LLC ≠ Production: BCE-MACH III LLC (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: SABINAL ENERGY OPERATING LLC ≠ Permit: CHEVRON U. S. A. INC.

Resolved via: productionBCE-MACH III LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2003-12

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#538207 A CHEVRON U. S. A. INC.
received 2003-11-04

Well Details

Well Number
2
Max Depth
9,000 ft
Drill Type
Vertical
County
GAINES
District
8
Completed
2003-12-16

Operator

Location
THE WOODLAN, DS
P-5 Status
Y (filed 2025-05-02)
Cum Oil (all leases)
36,722,630 bbl
Cum Gas (all leases)
23,917 mcf
Total Permits
146

External Links

Live © 2026 Petrora