42-165-38443

PRODUCING

RUTH HUDSON

GAINES County · District 8 · CAPTUREPOINT LLC · GEORGE ALLEN (SAN ANDRES)

RRC Lookup

Permits

2

Max Depth

5,500 ft

First Permit

2016-10-18

Latest Activity

2016-10-18

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2017-03-15

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: CAPTUREPOINT LLC ≠ Permit: TRINITY EOR, LLC

Resolved via: productionCAPTUREPOINT LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2008-04

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#818432 A TRINITY EOR, LLC
received 2016-12-21
#818432 A TRINITY EOR, LLC
received 2016-09-13

Well Details

Well Number
70
Max Depth
5,500 ft
Drill Type
Vertical
County
GAINES
District
8
Completed
2017-03-15

Operator

Location
ALLEN
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
4,222,463 bbl
Cum Gas (all leases)
26,682 mcf
Activities
OPRS/G, OPRS/O
Total Permits
3

External Links

Live © 2026 Petrora