42-165-38675
SHUT IN HorizontalWCE
GAINES County · District 8 · GRACE PETROLEUM OPERATING LLC · PLATANG (SAN ANDRES)
Permits
1
Max Depth
6,000 ft
First Permit
2018-02-16
Latest Activity
2018-02-16
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2018-12-21
Shut-In
—
Plugged
—
P-5 Org Status: X
!
EWA / Permit operator mismatch
Scheduling: GRACE PETROLEUM OPERATING LLC ≠ Permit: WINDY COVE ENERGY II, LLC
Resolved via: scheduling → GRACE PETROLEUM OPERATING LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2018-02
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#836453 A WINDY COVE ENERGY II, LLC
received 2018-02-15
Lat 32.944069
Lon -102.997644
Well Details
- Well Number
- 6H
- Max Depth
- 6,000 ft
- Drill Type
- Horizontal
- County
- GAINES
- District
- 8
- Operator
- GRACE PETROLEUM OPERATING LLC
- Completed
- 2018-12-21
Operator
- Location
- LLANO
- P-5 Status
- Y (filed 2025-07-04)
- Cum Oil (all leases)
- 631,054 bbl
- Cum Gas (all leases)
- 628,345 mcf
- Activities
- GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 1