42-167-01444

Final Completion

O DANIEL UNIT

GALVESTON County · District 3 · POLARIS ENTERPRISES INC · ALTA LOMA EAST (S- SAND)

RRC Lookup

Permits

2

Max Depth

15,143 ft

First Permit

1986-10-29

Latest Activity

1986-10-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-01-08

Shut-In

Plugged

1994-04-20

!

EWA / Permit operator mismatch

Scheduling: POLARIS ENTERPRISES INC ≠ Permit: CHILTON ENERGY

Resolved via: schedulingPOLARIS ENTERPRISES INC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-08

Operator History

originally filed by CHILTON ENERGY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#322451 A CHILTON ENERGY
received 1987-03-04
#322451 A SENDERO
received 1986-10-29

Well Details

Well Number
2A
Max Depth
15,143 ft
Drill Type
Vertical
County
GALVESTON
District
3
Completed
1988-01-08

Operator

Location
HOUSTON
P-5 Status
Y (filed 1998-12-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
191,654 mcf

External Links

Live © 2026 Petrora