42-167-30853

Final Completion

HUFF A UNIT

GALVESTON County · District 3 · DUNE OPERATING COMPANY · HITCHCOCK NE. (FRIO 9100)

RRC Lookup

Permits

1

Max Depth

3,850 ft

First Permit

1981-07-30

Latest Activity

1981-07-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2013-03-28

Shut-In

Plugged

2014-11-12

!

EWA / Permit operator mismatch

Scheduling: DUNE OPERATING COMPANY ≠ Permit: PHILLIPS PETROLEUM COMPANY

Resolved via: schedulingDUNE OPERATING COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2014-11

Operator History

originally filed by PHILLIPS PETROLEUM COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#128251 A PHILLIPS PETROLEUM COMPANY
received 1981-07-30

Well Details

Well Number
1 D
Max Depth
3,850 ft
Drill Type
Vertical
County
GALVESTON
District
3
Completed
2013-03-28

Operator

Location
DALLAS
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
569,293 bbl
Cum Gas (all leases)
17,986,644 mcf
Total Permits
62

External Links

Live © 2026 Petrora