Permits
1
Max Depth
5,000 ft
First Permit
1997-03-06
Latest Activity
1997-03-06
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
1997-06-28
Shut-In
—
Plugged
—
P-5 Org Status: Delinquent
!
EWA / Permit operator mismatch
Scheduling: B & S SALVAGE ≠ Permit: WHEELER OPERATING CORPORATION
Resolved via: scheduling → B & S SALVAGE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1997-05
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#459392 A WHEELER OPERATING CORPORATION
received 1997-03-03
Well Details
- Well Number
- 2W
- Max Depth
- 5,000 ft
- Drill Type
- Vertical
- County
- GARZA
- District
- 8
- Operator
- B & S SALVAGE
- Completed
- 1997-06-28
Operator
- Name
- B & S SALVAGE
- Location
- POST
- P-5 Status
- Y (filed 2025-10-04)
- Cum Oil (all leases)
- 386,281 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- CSGD/P, G/PUR, OPRS/O
- Total Permits
- 20