42-173-31731

Plug Dry Hole (P&A)

DOLLIE NEAL

GLASSCOCK County · District 8 · WILDCAT

RRC Lookup

Permits

1

Max Depth

10,500 ft

First Permit

1984-11-06

Latest Activity

1984-11-06

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1985-02-08

!

EWA / Permit operator mismatch

Scheduling: MABEE PETROLEUM CORP ≠ Permit: MABEE PETROLEUM CORP.

Resolved via: schedulingMABEE PETROLEUM CORP

Operator History

originally filed by MABEE PETROLEUM CORP. — asset transferred

Permit Applications (1)

#256775 A MABEE PETROLEUM CORP.
received 1984-11-05

Well Details

Well Number
1
Max Depth
10,500 ft
Drill Type
Vertical
County
GLASSCOCK
District
8
Operator

External Links

Live © 2026 Petrora