42-173-32005

Final Completion Directional

HOUSTON NESTE 14

GLASSCOCK County · District 8 · THOMPSON J. CLEO · MUSTANG (WOLFCAMP)

RRC Lookup

Permits

3

Max Depth

11,200 ft

First Permit

1987-10-07

Latest Activity

2004-07-22

Lifespan

17 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-06-22

Shut-In

Plugged

2017-06-18

!

EWA / Production operator mismatch

Scheduling: THOMPSON J. CLEO ≠ Production: COG OPERATING LLC (reported 2019-01)

Resolved via: schedulingTHOMPSON J. CLEO

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2021-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#548499 A THOMPSON, J. CLEO
received 2004-07-20
#449062 A MERIDIAN OIL INC.
received 1996-06-07
#336913 A UNION TEXAS PETROLEUM CORP.
received 1987-10-05

Well Details

Well Number
1
Max Depth
11,200 ft
Drill Type
Directional
County
GLASSCOCK
District
8
Completed
1996-06-22

Operator

Location
DALLAS
P-5 Status
Y (filed 2023-11-03)
Cum Oil (all leases)
34,884,610 bbl
Cum Gas (all leases)
184,572,150 mcf
Total Permits
1,739

External Links

Live © 2026 Petrora