42-175-32091
Final CompletionRAY GEORGE A.
GOLIAD County · District 2 · SPILLER ENERGY CO. · STATUE (YEGUA)
Permits
2
Max Depth
5,000 ft
First Permit
1985-10-01
Latest Activity
1986-08-29
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-12-06
Shut-In
—
Plugged
1988-02-12
!
EWA / Permit operator mismatch
Scheduling: SPILLER ENERGY CO. ≠ Permit: SPILLER, ROBERT S.
Resolved via: scheduling → SPILLER ENERGY CO.
Operator History
originally filed by SPILLER, ROBERT S. — asset transferred
Permit History (2)
Permit Applications (2)
#320089 A SPILLER, ROBERT S.
received 1986-08-11
#286358 A SPILLER ENERGY CO.
received 1985-09-30
Well Details
- Well Number
- 1
- Max Depth
- 5,000 ft
- Drill Type
- Vertical
- County
- GOLIAD
- District
- 2
- Operator
- SPILLER ENERGY CO.
- Completed
- 1985-12-06
Operator
- Name
- SPILLER ENGY CO
- Location
- SAN ANTONIO
- P-5 Status
- Y (filed 1988-01-18)
- Total Permits
- 2