42-175-32257

Final Completion

PIEPER

GOLIAD County · District 2 · BELLOWS DEWEY OPER. CO. LTD. · FANNIN NORTH (3650)

RRC Lookup

Permits

2

Max Depth

4,200 ft

First Permit

1987-07-02

Latest Activity

1987-07-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-08-11

Shut-In

Plugged

2005-05-04

!

EWA / Production operator mismatch

Scheduling: BELLOWS DEWEY OPER. CO. LTD. ≠ Production: STAR PRODUCTION, INC. (reported 2000-09)

!

EWA / Permit operator mismatch

Scheduling: BELLOWS DEWEY OPER. CO. LTD. ≠ Permit: STAR PRODUCTION, INC.

Resolved via: schedulingBELLOWS DEWEY OPER. CO. LTD.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2005-05

Operator History

originally filed by STAR PRODUCTION, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#332385 A STAR PRODUCTION, INC.
received 1987-11-04
#332385 A STAR PRODUCTION, INC.
received 1987-07-02

Well Details

Well Number
1
Max Depth
4,200 ft
Drill Type
Vertical
County
GOLIAD
District
2
Completed
1987-08-11

Operator

Location
REFUGIO
P-5 Status
Y (filed 2013-06-07)
Cum Oil (all leases)
56,897 bbl
Cum Gas (all leases)
146,065 mcf
Total Permits
8

External Links

Live © 2026 Petrora