42-175-32451
Final CompletionHAUSMANN GAS UNIT A
GOLIAD County · District 2 · COSTILLA PETROLEUM CORPORATION · CEDAR BRUSH (3RD MASSIVE WILCOX)
Permits
3
Max Depth
10,500 ft
First Permit
1989-10-25
Latest Activity
1989-10-25
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1990-03-27
Shut-In
—
Plugged
1996-08-02
EWA / Production operator mismatch
Scheduling: COSTILLA PETROLEUM CORPORATION ≠ Production: VALLEY GATHERING COMPANY (reported 1995-11)
EWA / Permit operator mismatch
Scheduling: COSTILLA PETROLEUM CORPORATION ≠ Permit: TXO PRODUCTION CORP.
Resolved via: scheduling → COSTILLA PETROLEUM CORPORATION
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1996-08
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (3)
Permit Applications (3)
Well Details
- Well Number
- 1
- Max Depth
- 10,500 ft
- Drill Type
- Vertical
- County
- GOLIAD
- District
- 2
- Operator
- COSTILLA PETROLEUM CORPORATION
- Completed
- 1990-03-27
Operator
- Name
- COSTILLA PETRO CORP
- Location
- MIDLAND
- P-5 Status
- Y (filed 1998-01-05)
- Cum Oil (all leases)
- 2,333,776 bbl
- Cum Gas (all leases)
- 10,236,504 mcf
- Total Permits
- 120