42-175-32681
Final CompletionBEGO # 1
GOLIAD County · District 2 · GEC OPERATING INC. · TERRELL POINT (3915)
Permits
1
Max Depth
4,350 ft
First Permit
1992-11-19
Latest Activity
1992-11-19
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1993-01-06
Shut-In
—
Plugged
2007-03-30
!
EWA / Permit operator mismatch
Scheduling: GEC OPERATING INC. ≠ Permit: GARDNER ENERGY CORPORATION
Resolved via: scheduling → GEC OPERATING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2007-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#406330 A GARDNER ENERGY CORPORATION
received 1992-11-19
Well Details
- Well Number
- 1
- Max Depth
- 4,350 ft
- Drill Type
- Vertical
- County
- GOLIAD
- District
- 2
- Operator
- GEC OPERATING INC.
- Completed
- 1993-01-06
Operator
- Name
- GEC OPER, INC
- Location
- HOUSTON
- P-5 Status
- Y (filed 2026-01-04)
- Cum Oil (all leases)
- 35,871 bbl
- Cum Gas (all leases)
- 746,084 mcf
- Activities
- OPRS/G
- Total Permits
- 10