42-175-32681

Final Completion

BEGO # 1

GOLIAD County · District 2 · GEC OPERATING INC. · TERRELL POINT (3915)

RRC Lookup

Permits

1

Max Depth

4,350 ft

First Permit

1992-11-19

Latest Activity

1992-11-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1993-01-06

Shut-In

Plugged

2007-03-30

!

EWA / Permit operator mismatch

Scheduling: GEC OPERATING INC. ≠ Permit: GARDNER ENERGY CORPORATION

Resolved via: schedulingGEC OPERATING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2007-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#406330 A GARDNER ENERGY CORPORATION
received 1992-11-19

Well Details

Well Number
1
Max Depth
4,350 ft
Drill Type
Vertical
County
GOLIAD
District
2
Completed
1993-01-06

Operator

Location
HOUSTON
P-5 Status
Y (filed 2026-01-04)
Cum Oil (all leases)
35,871 bbl
Cum Gas (all leases)
746,084 mcf
Activities
OPRS/G
Total Permits
10

External Links

Live © 2026 Petrora