42-175-33064

Final Completion

SEILER

GOLIAD County · District 2 · BELCO ENERGY CORP. · SCHROEDER (3400)

RRC Lookup

Permits

3

Max Depth

4,100 ft

First Permit

1998-02-04

Latest Activity

2000-11-06

Lifespan

3 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1998-04-01

Shut-In

Plugged

2001-06-02

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1998-04

Last Production

2001-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#501468 A BELCO ENERGY CORP.
received 2000-12-06
#501468 A BELCO ENERGY CORP.
received 2000-11-01
#472930 A EDGE PETROLEUM OPER. CO., INC.
received 1998-02-04

Well Details

Well Number
1
Max Depth
4,100 ft
Drill Type
Vertical
County
GOLIAD
District
2
Completed
1998-04-01

Operator

Location
DALLAS
P-5 Status
Y (filed 2002-06-07)
Cum Oil (all leases)
8,718,082 bbl
Cum Gas (all leases)
10,927,451 mcf
Total Permits
109

External Links

Live © 2026 Petrora