Permits
1
Max Depth
9,000 ft
First Permit
1998-04-03
Latest Activity
1998-04-03
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
2004-01-20
!
EWA / Permit operator mismatch
Scheduling: SANTOS USA CORP. ≠ Permit: ESENJAY PETROLEUM CORP.
Resolved via: scheduling → SANTOS USA CORP.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1998-07
Last Production
2004-08
Operator History
originally filed by ESENJAY PETROLEUM CORP. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#474994 A ESENJAY PETROLEUM CORP.
received 1998-04-03
Well Details
- Well Number
- 1
- Max Depth
- 9,000 ft
- Drill Type
- Vertical
- County
- GOLIAD
- District
- 2
- Operator
- SANTOS USA CORP.
Operator
- Name
- SANTOS USA CORP
- Location
- HOUSTON
- P-5 Status
- Y (filed 2010-09-03)
- Cum Oil (all leases)
- 583,086 bbl
- Cum Gas (all leases)
- 63,820,083 mcf
- Total Permits
- 67