42-175-33092

Final Completion DirectionalSidetrack

SIMMONS GAS UNIT

GOLIAD County · District 2 · XTO ENERGY INC. · AUSTIN (WILCOX MASSIVE E)

RRC Lookup

Permits

4

Max Depth

14,500 ft

First Permit

1998-05-29

Latest Activity

1998-05-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2000-08-11

Shut-In

Plugged

2013-11-15

!

EWA / Permit operator mismatch

Scheduling: XTO ENERGY INC. ≠ Permit: TEXACO E & P INC.

Resolved via: schedulingXTO ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2000-08

Last Production

2013-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#476718 A TEXACO E & P INC.
received 2001-04-13
#476718 A TEXACO E & P INC.
received 2000-06-30
#476718 A TEXACO E & P INC.
received 2000-04-07
#476718 A TEXACO E & P INC.
received 1998-05-29

Well Details

Well Number
3
Max Depth
14,500 ft
Drill Type
Directional, Sidetrack
County
GOLIAD
District
2
Completed
2000-08-11

Operator

Location
SPRING
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
755,132,920 bbl
Cum Gas (all leases)
11,012,998,973 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,136

External Links

Live © 2026 Petrora