42-175-33093

Final Completion

HAUSMANN

GOLIAD County · District 2 · BELCO ENERGY CORP. · SCHROEDER (MIOCENE 1450)

RRC Lookup

Permits

2

Max Depth

3,850 ft

First Permit

1998-06-01

Latest Activity

2000-08-14

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1998-07-16

Shut-In

Plugged

2001-07-12

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1998-07

Last Production

2001-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#498148 A BELCO ENERGY CORP.
received 2000-08-07
#476757 A EDGE PETROLEUM OPER. CO., INC.
received 1998-06-01

Well Details

Well Number
1
Max Depth
3,850 ft
Drill Type
Vertical
County
GOLIAD
District
2
Completed
1998-07-16

Operator

Location
DALLAS
P-5 Status
Y (filed 2002-06-07)
Cum Oil (all leases)
8,718,082 bbl
Cum Gas (all leases)
10,927,451 mcf
Total Permits
109

External Links

Live © 2026 Petrora