42-177-30498
Final Completion HorizontalHRBACEK
GONZALES County · District 1 · NUCORP ENERGY INC. · PILGRIM (WILCOX)
Permits
5
Max Depth
10,500 ft
First Permit
1979-06-25
Latest Activity
2011-05-25
Lifespan
32 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-04-02
Shut-In
—
Plugged
1985-12-05
EWA / Production operator mismatch
Scheduling: NUCORP ENERGY INC. ≠ Production: BAYTEX ENERGY USA, INC. (reported 2025-04)
EWA / Permit operator mismatch
Scheduling: NUCORP ENERGY INC. ≠ Permit: LUCAS ENERGY, INC.
Resolved via: scheduling → NUCORP ENERGY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2010-10
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (5)
MILTON HINES · 10,500 ft
2011-05-25
Spud 2011-08-25
MILTON HINES · 10,500 ft
2009-11-13
Spud 2010-02-25
MILTON HINES · 9,100 ft
2009-11-13
HRBACEK, EMIL · 9,500 ft
1982-02-22
HRBACEK, EMIL · 9,500 ft
1979-06-25
Spud 1979-11-18
Permit Applications (5)
Well Details
- Well Number
- 1ST
- Max Depth
- 10,500 ft
- Drill Type
- Horizontal
- County
- GONZALES
- District
- 1
- Operator
- NUCORP ENERGY INC.
- Completed
- 1982-04-02
Operator
- Name
- NUCORP ENGY, INC
- Location
- SAN ANTONIO
- P-5 Status
- Y (filed 1987-06-15)
- Total Permits
- 149