42-177-30645
Final CompletionHAJEK GEORGE
GONZALES County · District 1 · PETRO-SALVAGE INC. · NICKEL (AUSTIN CHALK)
Permits
1
Max Depth
11,000 ft
First Permit
1980-10-01
Latest Activity
1980-10-01
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-01-24
Shut-In
—
Plugged
1988-06-23
!
EWA / Permit operator mismatch
Scheduling: PETRO-SALVAGE INC. ≠ Permit: CZAR RESOURCES, INC.
Resolved via: scheduling → PETRO-SALVAGE INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
originally filed by CZAR RESOURCES, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#94305 A CZAR RESOURCES, INC.
received 1980-10-01
Well Details
- Well Number
- 1
- Max Depth
- 11,000 ft
- Drill Type
- Vertical
- County
- GONZALES
- District
- 1
- Operator
- PETRO-SALVAGE INC.
- Completed
- 1981-01-24
Operator
- Name
- PETRO-SALVAGE INC.
- Location
- PLUM
- P-5 Status
- Y (filed 1994-12-02)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf