42-177-30869
Final CompletionLAMPRECHT
GONZALES County · District 1 · TDC ENGINEERING INC. · PEACH CREEK (AUSTIN CHALK)
Permits
1
Max Depth
8,500 ft
First Permit
1981-03-17
Latest Activity
1981-03-17
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-08-24
Shut-In
—
Plugged
1985-02-25
!
EWA / Permit operator mismatch
Scheduling: TDC ENGINEERING INC. ≠ Permit: TEXAS DRILLING CO.
Resolved via: scheduling → TDC ENGINEERING INC.
Operator History
originally filed by TEXAS DRILLING CO. — asset transferred
Permit History (1)
Permit Applications (1)
#112372 A TEXAS DRILLING CO.
received 1981-03-17
Well Details
- Well Number
- 1
- Max Depth
- 8,500 ft
- Drill Type
- Vertical
- County
- GONZALES
- District
- 1
- Operator
- TDC ENGINEERING INC.
- Completed
- 1981-08-24
Operator
- Name
- TDC ENGINEERING, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-08-04)
- Cum Oil (all leases)
- 519,590 bbl
- Cum Gas (all leases)
- 5,474,807 mcf
- Activities
- OPRS/O
- Total Permits
- 224