42-177-30950
Final CompletionHOFFMAN
GONZALES County · District 1 · ADAIR & BALLINGER PETRO. INC. · PEACH CREEK (AUSTIN CHALK)
Permits
1
Max Depth
8,500 ft
First Permit
1981-05-11
Latest Activity
1981-05-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-07-20
Shut-In
—
Plugged
1985-09-23
!
EWA / Permit operator mismatch
Scheduling: ADAIR & BALLINGER PETRO. INC. ≠ Permit: TEXAS DRILLING CO.
Resolved via: scheduling → ADAIR & BALLINGER PETRO. INC.
Operator History
originally filed by TEXAS DRILLING CO. — asset transferred
Permit History (1)
Permit Applications (1)
#117648 A TEXAS DRILLING CO.
received 1981-05-11
Well Details
- Well Number
- 1
- Max Depth
- 8,500 ft
- Drill Type
- Vertical
- County
- GONZALES
- District
- 1
- Operator
- ADAIR & BALLINGER PETRO. INC.
- Completed
- 1981-07-20
Operator
- Location
- AUSTIN
- P-5 Status
- Y (filed 1992-10-27)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 6