42-177-31004

Final Completion

GONZALES

GONZALES County · District 1 · ADAIR & BALLINGER PETRO. INC. · CHRISTIAN (6800)

RRC Lookup

Permits

1

Max Depth

7,850 ft

First Permit

1981-07-02

Latest Activity

1981-07-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-08-07

Shut-In

Plugged

1991-06-05

!

EWA / Permit operator mismatch

Scheduling: ADAIR & BALLINGER PETRO. INC. ≠ Permit: LA SALLE ENERGY, CORP.

Resolved via: schedulingADAIR & BALLINGER PETRO. INC.

Operator History

originally filed by LA SALLE ENERGY, CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#123539 A LA SALLE ENERGY, CORP.
received 1981-07-02

Well Details

Well Number
1
Max Depth
7,850 ft
Drill Type
Vertical
County
GONZALES
District
1
Completed
1981-08-07

Operator

Location
AUSTIN
P-5 Status
Y (filed 1992-10-27)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
6