42-177-31009

Final Completion

HOFFMAN

GONZALES County · District 1 · ADAIR & BALLINGER PETRO. INC. · PEACH CREEK (AUSTIN CHALK)

RRC Lookup

Permits

1

Max Depth

8,500 ft

First Permit

1981-07-07

Latest Activity

1981-07-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-08-03

Shut-In

Plugged

1988-04-16

!

EWA / Permit operator mismatch

Scheduling: ADAIR & BALLINGER PETRO. INC. ≠ Permit: TDC ENGINEERING, INC.

Resolved via: schedulingADAIR & BALLINGER PETRO. INC.

Operator History

originally filed by TDC ENGINEERING, INC. — asset transferred

Permit Applications (1)

#124393 A TDC ENGINEERING, INC.
received 1981-07-07

Well Details

Well Number
2
Max Depth
8,500 ft
Drill Type
Vertical
County
GONZALES
District
1
Completed
1981-08-03

Operator

Location
AUSTIN
P-5 Status
Y (filed 1992-10-27)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
6

External Links

Live © 2026 Petrora