42-177-31044

Final Completion

EPSTEIND

GONZALES County · District 1 · TDC ENGINEERING INC. · PEACH CREEK (AUSTIN CHALK)

RRC Lookup

Permits

2

Max Depth

6,900 ft

First Permit

1981-08-31

Latest Activity

1982-11-30

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-05-08

Shut-In

Plugged

1999-02-08

!

EWA / Production operator mismatch

Scheduling: TDC ENGINEERING INC. ≠ Production: SABRE OPERATING, INC. (reported 1996-01)

!

EWA / Permit operator mismatch

Scheduling: TDC ENGINEERING INC. ≠ Permit: PYRO ENERGY CORP.

Resolved via: schedulingTDC ENGINEERING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1999-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#183395 A PYRO ENERGY CORP.
received 1982-11-30
#132314 A BURNS, R. L. CORPORATION
received 1981-08-31

Well Details

Well Number
4
Max Depth
6,900 ft
Drill Type
Vertical
County
GONZALES
District
1
Completed
1982-05-08

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
519,590 bbl
Cum Gas (all leases)
5,474,807 mcf
Activities
OPRS/O
Total Permits
224

External Links

Live © 2026 Petrora