42-177-31149
Final CompletionWINKENWERDER
GONZALES County · District 1 · TDC ENGINEERING INC. · PEACH CREEK (AUSTIN CHALK)
Permits
3
Max Depth
8,200 ft
First Permit
1981-10-29
Latest Activity
1986-12-30
Lifespan
5 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-04-10
Shut-In
—
Plugged
2001-12-13
!
EWA / Production operator mismatch
Scheduling: TDC ENGINEERING INC. ≠ Production: P-R-O MANAGEMENT, INC. (reported 2005-10)
!
EWA / Permit operator mismatch
Scheduling: TDC ENGINEERING INC. ≠ Permit: GEOLAND, INC.
Resolved via: scheduling → TDC ENGINEERING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by GEOLAND, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (3)
Permit Applications (3)
#324930 A GEOLAND, INC.
received 1986-12-30
#163016 A TEXAS GENERAL PETR. CORP.
received 1981-12-31
#138923 A TEXAS GENERAL PETR. CORP.
received 1981-10-29
Well Details
- Well Number
- 1
- Max Depth
- 8,200 ft
- Drill Type
- Vertical
- County
- GONZALES
- District
- 1
- Operator
- TDC ENGINEERING INC.
- Completed
- 1987-04-10
Operator
- Name
- TDC ENGINEERING, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-08-04)
- Cum Oil (all leases)
- 519,590 bbl
- Cum Gas (all leases)
- 5,474,807 mcf
- Activities
- OPRS/O
- Total Permits
- 224