42-177-31150

Final Completion

WINKENWERDER

GONZALES County · District 1 · TDC ENGINEERING INC. · PEACH CREEK (AUSTIN CHALK)

RRC Lookup

Permits

3

Max Depth

7,730 ft

First Permit

1981-10-29

Latest Activity

1986-09-16

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-12-01

Shut-In

Plugged

2009-11-13

!

EWA / Production operator mismatch

Scheduling: TDC ENGINEERING INC. ≠ Production: P-R-O MANAGEMENT, INC. (reported 2005-10)

!

EWA / Permit operator mismatch

Scheduling: TDC ENGINEERING INC. ≠ Permit: GEOLAND, INC.

Resolved via: schedulingTDC ENGINEERING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by GEOLAND, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#320640 A GEOLAND, INC.
received 1986-09-16
#160412 A TEXAS GENERAL PETR. CORP.
received 1982-05-11
#138927 A TEXAS GENERAL PETR. CORP.
received 1981-10-29

Well Details

Well Number
2
Max Depth
7,730 ft
Drill Type
Vertical
County
GONZALES
District
1
Completed
1986-12-01

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
519,590 bbl
Cum Gas (all leases)
5,474,807 mcf
Activities
OPRS/O
Total Permits
224

External Links

Live © 2026 Petrora