42-177-31240
Final CompletionNIXON FARMS
GONZALES County · District 1 · TDC ENGINEERING INC. · PEACH CREEK (AUSTIN CHALK)
Permits
2
Max Depth
8,100 ft
First Permit
1982-02-08
Latest Activity
1992-04-15
Lifespan
10 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1992-04-18
Shut-In
—
Plugged
1998-07-09
EWA / Production operator mismatch
Scheduling: TDC ENGINEERING INC. ≠ Production: CHESAPEAKE OPERATING, INC. (reported 1994-08)
EWA / Permit operator mismatch
Scheduling: TDC ENGINEERING INC. ≠ Permit: CHESAPEAKE OPERATING, INC.
Resolved via: scheduling → TDC ENGINEERING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
originally filed by CHESAPEAKE OPERATING, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
Well Details
- Well Number
- 2
- Max Depth
- 8,100 ft
- Drill Type
- Vertical
- County
- GONZALES
- District
- 1
- Operator
- TDC ENGINEERING INC.
- Completed
- 1992-04-18
Operator
- Name
- TDC ENGINEERING, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-08-04)
- Cum Oil (all leases)
- 519,590 bbl
- Cum Gas (all leases)
- 5,474,807 mcf
- Activities
- OPRS/O
- Total Permits
- 224