42-177-31276
Final CompletionNIXON
GONZALES County · District 1 · K-N OPERATING CORP. · PEACH CREEK (AUSTIN CHALK)
Permits
1
Max Depth
8,100 ft
First Permit
1982-03-17
Latest Activity
1982-03-17
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-04-29
Shut-In
—
Plugged
1982-12-05
!
EWA / Permit operator mismatch
Scheduling: K-N OPERATING CORP. ≠ Permit: ZONERGY, INC.
Resolved via: scheduling → K-N OPERATING CORP.
Operator History
originally filed by ZONERGY, INC. — asset transferred
Permit History (1)
Permit Applications (1)
#155123 A ZONERGY, INC.
received 1982-03-17
Well Details
- Well Number
- 3
- Max Depth
- 8,100 ft
- Drill Type
- Vertical
- County
- GONZALES
- District
- 1
- Operator
- K-N OPERATING CORP.
- Completed
- 1982-04-29
Operator
- Name
- K-N OPER CORP
- Location
- AUSTIN
- P-5 Status
- Y (filed 1992-02-05)
- Total Permits
- 23