42-177-31318

Final Completion

NEEDHAM

GONZALES County · District 1 · TDC ENGINEERING INC. · CHRISTIAN (6800)

RRC Lookup

Permits

1

Max Depth

8,000 ft

First Permit

1982-06-10

Latest Activity

1982-06-10

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-02-03

Shut-In

Plugged

2001-10-12

!

EWA / Permit operator mismatch

Scheduling: TDC ENGINEERING INC. ≠ Permit: GEOFOCUS, INC.

Resolved via: schedulingTDC ENGINEERING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#163269 A GEOFOCUS, INC.
received 1982-06-10

Well Details

Well Number
01
Max Depth
8,000 ft
Drill Type
Vertical
County
GONZALES
District
1
Completed
1983-02-03

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
519,590 bbl
Cum Gas (all leases)
5,474,807 mcf
Activities
OPRS/O
Total Permits
224

External Links

Live © 2026 Petrora