42-177-31675

Final Completion

DEACON

GONZALES County · District 1 · HA.P.C. OIL INC. · PEACH CREEK (BUDA)

RRC Lookup

Permits

1

Max Depth

8,200 ft

First Permit

1986-10-09

Latest Activity

1986-10-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-10-31

Shut-In

Plugged

1993-11-20

!

EWA / Permit operator mismatch

Scheduling: HA.P.C. OIL INC. ≠ Permit: K-N OPERATING CORP.

Resolved via: schedulingHA.P.C. OIL INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-12

Operator History

originally filed by K-N OPERATING CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#321648 A K-N OPERATING CORP.
received 1986-10-09

Well Details

Well Number
3
Max Depth
8,200 ft
Drill Type
Vertical
County
GONZALES
District
1
Completed
1986-10-31

Operator

Location
GONZALES
P-5 Status
Y (filed 2006-04-07)
Cum Oil (all leases)
80,936 bbl
Cum Gas (all leases)
40,754 mcf
Total Permits
1

External Links

Live © 2026 Petrora