42-177-31697
Final CompletionWELLS J.B. JR.
GONZALES County · District 1 · TDC ENGINEERING INC. · MAG (AUSTIN CHALK)
Permits
2
Max Depth
8,100 ft
First Permit
1987-11-16
Latest Activity
1988-07-01
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1988-07-28
Shut-In
—
Plugged
1998-04-27
!
EWA / Permit operator mismatch
Scheduling: TDC ENGINEERING INC. ≠ Permit: MOBIL PRODUCING TX. & N.M. INC.
Resolved via: scheduling → TDC ENGINEERING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-06
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#348429 A MOBIL PRODUCING TX. & N.M. INC.
received 1988-07-01
#338940 A MOBIL PRODUCING TX. & N.M. INC.
received 1987-11-16
Well Details
- Well Number
- 1
- Max Depth
- 8,100 ft
- Drill Type
- Vertical
- County
- GONZALES
- District
- 1
- Operator
- TDC ENGINEERING INC.
- Completed
- 1988-07-28
Operator
- Name
- TDC ENGINEERING, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-08-04)
- Cum Oil (all leases)
- 519,590 bbl
- Cum Gas (all leases)
- 5,474,807 mcf
- Activities
- OPRS/O
- Total Permits
- 224