42-177-31697

Final Completion

WELLS J.B. JR.

GONZALES County · District 1 · TDC ENGINEERING INC. · MAG (AUSTIN CHALK)

RRC Lookup

Permits

2

Max Depth

8,100 ft

First Permit

1987-11-16

Latest Activity

1988-07-01

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-07-28

Shut-In

Plugged

1998-04-27

!

EWA / Permit operator mismatch

Scheduling: TDC ENGINEERING INC. ≠ Permit: MOBIL PRODUCING TX. & N.M. INC.

Resolved via: schedulingTDC ENGINEERING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1998-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#348429 A MOBIL PRODUCING TX. & N.M. INC.
received 1988-07-01
#338940 A MOBIL PRODUCING TX. & N.M. INC.
received 1987-11-16

Well Details

Well Number
1
Max Depth
8,100 ft
Drill Type
Vertical
County
GONZALES
District
1
Completed
1988-07-28

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
519,590 bbl
Cum Gas (all leases)
5,474,807 mcf
Activities
OPRS/O
Total Permits
224

External Links

Live © 2026 Petrora