42-177-31873
Final Completion HorizontalGORDON UNIT
GONZALES County · District 1 · TDC ENGINEERING INC. · PILGRIM (AUSTIN CHALK)
Permits
1
Max Depth
9,500 ft
First Permit
1991-02-01
Latest Activity
1991-02-01
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1991-04-03
Shut-In
—
Plugged
2007-05-18
!
EWA / Permit operator mismatch
Scheduling: TDC ENGINEERING INC. ≠ Permit: SANCHEZ-O'BRIEN / TEXACO INC.
Resolved via: scheduling → TDC ENGINEERING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2010-06
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#384144 A SANCHEZ-O'BRIEN / TEXACO INC.
received 1991-02-01
Well Details
- Well Number
- 1
- Max Depth
- 9,500 ft
- Drill Type
- Horizontal
- County
- GONZALES
- District
- 1
- Operator
- TDC ENGINEERING INC.
- Completed
- 1991-04-03
Operator
- Name
- TDC ENGINEERING, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-08-04)
- Cum Oil (all leases)
- 519,590 bbl
- Cum Gas (all leases)
- 5,474,807 mcf
- Activities
- OPRS/O
- Total Permits
- 224