42-181-00969
Final CompletionDAVIS H. A.
GRAYSON County · District 9 · MAVERICK PRODUCTION · HESTER (STRAWN UPPER)
Permits
1
Max Depth
5,761 ft
First Permit
1979-05-11
Latest Activity
1979-05-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-06-25
Shut-In
—
Plugged
2002-05-29
!
EWA / Permit operator mismatch
Scheduling: MAVERICK PRODUCTION ≠ Permit: GRAYSON PETROLEUM COMPANY
Resolved via: scheduling → MAVERICK PRODUCTION
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2002-09
Operator History
originally filed by GRAYSON PETROLEUM COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#50294 A GRAYSON PETROLEUM COMPANY
received 1979-05-11
Well Details
- Well Number
- 1
- Max Depth
- 5,761 ft
- Drill Type
- Vertical
- County
- GRAYSON
- District
- 9
- Operator
- MAVERICK PRODUCTION
- Completed
- 1979-06-25
Operator
- Name
- MAVERICK PRODUCTION
- Location
- NOCONA
- P-5 Status
- Y (filed 2007-10-05)
- Cum Oil (all leases)
- 78,115 bbl
- Cum Gas (all leases)
- — mcf