42-181-00969

Final Completion

DAVIS H. A.

GRAYSON County · District 9 · MAVERICK PRODUCTION · HESTER (STRAWN UPPER)

RRC Lookup

Permits

1

Max Depth

5,761 ft

First Permit

1979-05-11

Latest Activity

1979-05-11

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-06-25

Shut-In

Plugged

2002-05-29

!

EWA / Permit operator mismatch

Scheduling: MAVERICK PRODUCTION ≠ Permit: GRAYSON PETROLEUM COMPANY

Resolved via: schedulingMAVERICK PRODUCTION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2002-09

Operator History

originally filed by GRAYSON PETROLEUM COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#50294 A GRAYSON PETROLEUM COMPANY
received 1979-05-11

Well Details

Well Number
1
Max Depth
5,761 ft
Drill Type
Vertical
County
GRAYSON
District
9
Completed
1979-06-25

Operator

Location
NOCONA
P-5 Status
Y (filed 2007-10-05)
Cum Oil (all leases)
78,115 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora