42-181-30651
Final CompletionLOGSTON-GRAYSON COUNTY UNIT
GRAYSON County · District 9 · AUBURN PETROLEUM INC. · SHERMAN (DAVIS)
Permits
1
Max Depth
8,820 ft
First Permit
1978-10-11
Latest Activity
1978-10-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-06-15
Shut-In
—
Plugged
1986-01-16
!
EWA / Permit operator mismatch
Scheduling: AUBURN PETROLEUM INC. ≠ Permit: MULKEY ENGINEERING CO., INC.
Resolved via: scheduling → AUBURN PETROLEUM INC.
Operator History
originally filed by MULKEY ENGINEERING CO., INC. — asset transferred
Permit History (1)
Permit Applications (1)
#35568 A MULKEY ENGINEERING CO., INC.
received 1978-10-11
Well Details
- Well Number
- 1
- Max Depth
- 8,820 ft
- Drill Type
- Vertical
- County
- GRAYSON
- District
- 9
- Operator
- AUBURN PETROLEUM INC.
- Completed
- 1979-06-15
Operator
- Location
- DENISON
- P-5 Status
- Y (filed 1985-09-13)