42-181-31050

Final Completion

LOVEJOY B. F.

GRAYSON County · District 9 · MAVERICK PRODUCTION · COLLINSVILLE EAST (STRAWN 3600)

RRC Lookup

Permits

1

Max Depth

4,300 ft

First Permit

1984-05-01

Latest Activity

1984-05-01

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-06-08

Shut-In

Plugged

1995-05-11

!

EWA / Permit operator mismatch

Scheduling: MAVERICK PRODUCTION ≠ Permit: GRAYSON PETROLEUM COMPANY

Resolved via: schedulingMAVERICK PRODUCTION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-07

Operator History

originally filed by GRAYSON PETROLEUM COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#237247 A GRAYSON PETROLEUM COMPANY
received 1984-04-04

Well Details

Well Number
3
Max Depth
4,300 ft
Drill Type
Vertical
County
GRAYSON
District
9
Completed
1984-06-08

Operator

Location
NOCONA
P-5 Status
Y (filed 2007-10-05)
Cum Oil (all leases)
78,115 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora