42-185-30197
TEMP ABANDONEDSOUTHWEST DEVELOPMENT COMPANY
GRIMES County · District 3 · GALLOWAY ENERGY CO. · CARLETON SPEED (YEGUA 4B)
Permits
3
Max Depth
6,000 ft
First Permit
1977-08-22
Latest Activity
1983-04-18
Lifespan
6 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
1983-04-09
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Permit operator mismatch
Scheduling: GALLOWAY ENERGY CO. ≠ Permit: HIGH CHAPPARAL OIL COMPANY
Resolved via: scheduling → GALLOWAY ENERGY CO.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by HIGH CHAPPARAL OIL COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (3)
Permit Applications (3)
#191599 A HIGH CHAPPARAL OIL COMPANY
received 1983-04-18
#190560 A HIGH CHAPPARAL OIL COMPANY
received 1983-04-05
#5910 A HIGH CHAPPARAL OIL COMPANY
received 1977-08-22
Well Details
- Well Number
- 6
- Max Depth
- 6,000 ft
- Drill Type
- Vertical
- County
- GRIMES
- District
- 3
- Operator
- GALLOWAY ENERGY CO.
- Completed
- 1983-04-09
Operator
- Name
- GALLOWAY ENGY CO
- Location
- TOMBALL
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 97,492 bbl
- Cum Gas (all leases)
- 3,185,600 mcf
- Activities
- GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 11