42-185-30499

TEMP ABANDONED HorizontalSidetrack

ROBERT

GRIMES County · District 3 · WAYLANDER LLC · IOLA (GEORGETOWN)

RRC Lookup

Permits

2

Max Depth

11,000 ft

First Permit

1995-01-27

Latest Activity

1995-01-27

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1995-08-05

Shut-In

Plugged

P-5 Org Status: Delinquent

!

EWA / Production operator mismatch

Scheduling: WAYLANDER LLC ≠ Production: PRIDE ENERGY COMPANY (reported 2016-01)

!

EWA / Permit operator mismatch

Scheduling: WAYLANDER LLC ≠ Permit: CHESAPEAKE OPERATING, INC.

Resolved via: schedulingWAYLANDER LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-05

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#432323 A CHESAPEAKE OPERATING, INC.
received 1995-07-13
#432323 A CHESAPEAKE OPERATING, INC.
received 1995-01-27

Well Details

Well Number
1H
Max Depth
11,000 ft
Drill Type
Horizontal, Sidetrack
County
GRIMES
District
3
Operator
WAYLANDER LLC
Completed
1995-08-05

Operator

Location
PLANO
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
8,228 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G, OPRS/O

External Links

Live © 2026 Petrora