Permits
1
Max Depth
1,200 ft
First Permit
1979-08-22
Latest Activity
1979-08-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-09-02
Shut-In
—
Plugged
2001-10-29
!
EWA / Permit operator mismatch
Scheduling: CANTU OIL CO. ≠ Permit: NOVA ENERGY GROUP, INC.
Resolved via: scheduling → CANTU OIL CO.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
originally filed by NOVA ENERGY GROUP, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#56224 A NOVA ENERGY GROUP, INC.
received 1979-08-22
Well Details
- Well Number
- 4
- Max Depth
- 1,200 ft
- Drill Type
- Vertical
- County
- GUADALUPE
- District
- 1
- Operator
- CANTU OIL CO.
- Completed
- 1979-09-02
Operator
- Name
- CANTU OIL CO.
- Location
- HOUSTON
- P-5 Status
- Y (filed 2001-11-09)
- Cum Oil (all leases)
- 399 bbl
- Cum Gas (all leases)
- — mcf