42-187-31298
Final CompletionMAY HERITAGE TRUST THE
GUADALUPE County · District 1 · 3-L DRILLING · LA VERNIA
Permits
1
Max Depth
850 ft
First Permit
1980-10-01
Latest Activity
1980-10-01
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-11-17
Shut-In
—
Plugged
1985-03-12
!
EWA / Permit operator mismatch
Scheduling: 3-L DRILLING ≠ Permit: WETZEL, A. H. JR.
Resolved via: scheduling → 3-L DRILLING
Operator History
originally filed by WETZEL, A. H. JR. — asset transferred
Permit History (1)
Permit Applications (1)
#94318 A WETZEL, A. H. JR.
received 1980-10-01
Well Details
- Well Number
- 1
- Max Depth
- 850 ft
- Drill Type
- Vertical
- County
- GUADALUPE
- District
- 1
- Operator
- 3-L DRILLING
- Completed
- 1980-11-17
Operator
- Name
- 3-L DRILLING
- Location
- ABILENE
- P-5 Status
- Y (filed 2019-06-07)
- Cum Oil (all leases)
- 19,233 bbl
- Cum Gas (all leases)
- 107 mcf
- Activities
- OPRS/O
- Total Permits
- 4