42-187-32020
Final CompletionZOBOROSKI
GUADALUPE County · District 1 · SAUR JERRY · DARST CREEK (BUDA)
Permits
1
Max Depth
2,550 ft
First Permit
1982-01-18
Latest Activity
1982-01-18
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-03-20
Shut-In
—
Plugged
1996-01-12
!
EWA / Permit operator mismatch
Scheduling: SAUR JERRY ≠ Permit: KINGWOOD ENERGY, INC.
Resolved via: scheduling → SAUR JERRY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2006-07
Operator History
originally filed by KINGWOOD ENERGY, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#149305 A KINGWOOD ENERGY, INC.
received 1982-01-18
Well Details
- Well Number
- 10
- Max Depth
- 2,550 ft
- Drill Type
- Vertical
- County
- GUADALUPE
- District
- 1
- Operator
- SAUR JERRY
- Completed
- 1982-03-20
Operator
- Name
- SAUR, JERRY
- Location
- LULING
- P-5 Status
- Y (filed 2025-10-04)
- Cum Oil (all leases)
- 145,278 bbl
- Cum Gas (all leases)
- — mcf