42-187-32969
Final CompletionRAKOWITZ EWALD
GUADALUPE County · District 1 · J.S.J. ENERGY · LA VERNIA
Permits
1
Max Depth
1,000 ft
First Permit
1985-03-05
Latest Activity
1985-03-05
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1992-10-12
!
EWA / Permit operator mismatch
Scheduling: J.S.J. ENERGY ≠ Permit: J-ENERGY
Resolved via: scheduling → J.S.J. ENERGY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2001-04
Last Production
2003-04
Operator History
originally filed by J-ENERGY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#269089 A J-ENERGY
received 1985-02-26
Well Details
- Well Number
- 4
- Max Depth
- 1,000 ft
- Drill Type
- Vertical
- County
- GUADALUPE
- District
- 1
- Operator
- J.S.J. ENERGY
Operator
- Name
- J.S.J. ENGY
- Location
- LA VERNIA
- P-5 Status
- Y (filed 1988-01-18)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 4