42-197-30733
Final CompletionPEASE RIVER
HARDEMAN County · District 9 · TRIO OPERATING COMPANY INC. · PEASE RIVER (BASAL CONGL.)
Permits
1
Max Depth
8,500 ft
First Permit
1984-07-17
Latest Activity
1984-07-17
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1989-02-02
Shut-In
—
Plugged
1997-09-05
!
EWA / Permit operator mismatch
Scheduling: TRIO OPERATING COMPANY INC. ≠ Permit: KOHLER ENERGY CORPORATION
Resolved via: scheduling → TRIO OPERATING COMPANY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1997-11
Operator History
originally filed by KOHLER ENERGY CORPORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#245358 A KOHLER ENERGY CORPORATION
received 1984-07-17
Well Details
- Well Number
- 1
- Max Depth
- 8,500 ft
- Drill Type
- Vertical
- County
- HARDEMAN
- District
- 9
- Operator
- TRIO OPERATING COMPANY INC.
- Completed
- 1989-02-02
Operator
- Name
- TRIO OPER CO, INC
- Location
- WICHITA FAL, LS
- P-5 Status
- Y (filed 2001-08-14)
- Cum Oil (all leases)
- 1,569,425 bbl
- Cum Gas (all leases)
- 408,179 mcf
- Total Permits
- 203