42-197-30844

Final Completion

HILL F

HARDEMAN County · District 9 · FARRELL ROY · RED DAWG (MISS. CHAPPEL)

RRC Lookup

Permits

1

Max Depth

9,300 ft

First Permit

1985-03-19

Latest Activity

1985-03-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-11-15

Shut-In

Plugged

1988-06-17

!

EWA / Permit operator mismatch

Scheduling: FARRELL ROY ≠ Permit: PHILLIPS OIL COMPANY

Resolved via: schedulingFARRELL ROY

Operator History

originally filed by PHILLIPS OIL COMPANY — asset transferred

Permit Applications (1)

#269958 A PHILLIPS OIL COMPANY
received 1985-03-18

Well Details

Well Number
1
Max Depth
9,300 ft
Drill Type
Vertical
County
HARDEMAN
District
9
Operator
FARRELL ROY
Completed
1987-11-15

Operator

Location
VERNON
P-5 Status
Y (filed 1995-01-06)
Cum Oil (all leases)
2,417 bbl
Cum Gas (all leases)
— mcf
Total Permits
6

External Links

Live © 2026 Petrora