42-197-30975

Final Completion

HAMPTON OSCAR B.

HARDEMAN County · District 9 · SMITH PIPE OF ABILENE · BERRY WEST (CONGL 7400)

RRC Lookup

Permits

1

Max Depth

8,600 ft

First Permit

1988-02-17

Latest Activity

1988-02-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-08-20

Shut-In

Plugged

1999-05-18

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: FOREE OIL COMPANY (reported 1997-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: CRANFORD OPERATING CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#322492 A CRANFORD OPERATING CO.
received 1986-10-30

Well Details

Well Number
1
Max Depth
8,600 ft
Drill Type
Vertical
County
HARDEMAN
District
9
Completed
1988-08-20

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora