42-197-31117

Final Completion

SCHMOKER LAMBERT TABOR UNIT

HARDEMAN County · District 9 · KADANE CORPORATION · CHILLICOTHE (325 SALVAGE)

RRC Lookup

Permits

1

Max Depth

500 ft

First Permit

1990-01-15

Latest Activity

1990-01-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1989-12-29

Shut-In

Plugged

1994-12-08

!

EWA / Permit operator mismatch

Scheduling: KADANE CORPORATION ≠ Permit: KADANE OIL COMPANY

Resolved via: schedulingKADANE CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-06

Operator History

originally filed by KADANE OIL COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#368666 A KADANE OIL COMPANY
received 1990-01-15

Well Details

Well Number
R 2
Max Depth
500 ft
Drill Type
Vertical
County
HARDEMAN
District
9
Completed
1989-12-29

Operator

Location
DALLAS
P-5 Status
Y (filed 2020-04-03)
Cum Oil (all leases)
3,185,675 bbl
Cum Gas (all leases)
8,920,721 mcf
Total Permits
39

External Links

Live © 2026 Petrora